AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-RI-KARI-MENE | Reinforcing ropes | ton | ||||||||||
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKARIME | Multi-purpose anti-friction lubricant for rolling and sliding friction units of mechanisms and machines operating in high temperature areas | ton | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-MERI_KAKAMERI | Polyethylene wrapping film, thickness 0.6 mm | SF | ||||||||||
| KAME-LI-MELI-KANE_KAKAVOPU | Diamond cutting disc with a profiled continuous cutting edge, diameter 9.06 in, diamond edge thickness 2.6 mm, diamond edge height 0.394 in | EA | ||||||||||
| KAME-LI-MELI-KALI_KAKASAPU | Straight profile grinding wheel, dimensions 230x5x0.866 in | EA | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | ton | ||||||||||
| RIPU-ME-KARI-KAME_KAKAMELI | Galvanized metal clamp with two quick-release locks and rubber profile for securing pipes, M8 fastening nut, diameter from 48 to 2.13 in | EA | ||||||||||
| RIPU-TO-KATO-METO_KAKAKAPU | Polyethylene pressure pipes, except for PE100 gas pipes, for water transportation, standard dimensional ratio SDR11, nominal outer diameter 2.48 in, wall thickness 5.8 mm | LF | ||||||||||
| RIPU-TO-KATO-METO_KAKATOPU | Polyethylene pressure pipes, except for PE100 gas pipes, for water transportation, standard dimensional ratio SDR13.6, nominal outer diameter 9.84 in, wall thickness 18.4 mm | LF | ||||||||||
| DXME-KASA-KAME_KAMEVO | Tower cranes, lifting capacity 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMEVO | Electricity: consumption 7.84 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKAME | Manual lever hoists | Machine hours | ||||||||||
| DXME-MEME-KAME_KARIME | Pushing devices for cable pulling, pulling force 1763.7 lb | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAPU | Dump trucks, load capacity up to 30 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KATORI | Hydraulic pump stations for driving hydraulic mechanisms, pressure up to 70 MPa | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||