AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KALI-RI-KALI-MEME | Metal support posts | EA | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | ton | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KASA-RITO_KAKAVOME | Sodium nitrite in solution, grade A, B, highest quality | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEPU | Natural sand for construction work, grade II, very fine | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKATO | Portland cement without additives for general construction CEM 0 42.5N | ton | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMENE | Ready-mixed masonry mortar, cement, M200 | CY | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | ton | ||||||||||
| MEKA-TO-KAME-KASA_KAKAKAME | Zinc powder, grade PC1 | lb | ||||||||||
| MEME-RI-METO-KANE_KAKAMETO | Floor panels, thickness 1.57 in | SF | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electric winches with a pulling force of up to 12.26 kN (1.25 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electricity: consumption 0.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEKA_KAKAME | Pneumatic shotcrete machines with electric drive for operation from mobile compressor units, capacity up to 9.2 CY/h | Machine hours | ||||||||||
| DXME-KALI-MEKA_KAKAME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 6.5 CY/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Electricity: consumption 12.21 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||