Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Open this position in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Removal of road marking lines by hydraulic means, with a line thickness of up to 0.118 in and a line width of 0.2 m

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/