AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-ME-KASA-KARI | Inlet valves | EA | ||||||||||
| MEPU-PU-KARI-KAPU | Oil-based paints | ton | ||||||||||
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MELI-KANE_KAKAVOPU | Diamond cutting disc with a profiled continuous cutting edge, diameter 9.06 in, diamond edge thickness 2.6 mm, diamond edge height 0.394 in | EA | ||||||||||
| KAPU-TO-KARI-METO_KARIMERI | Dry cement-sand masonry mixes, class B3.5 (M50) | ton | ||||||||||
| MEPU-TO-KAME-KARI_KAMEKAME | Acrylic primer VD-AK-133 | ton | ||||||||||
| RIPU-RI-KASA-KAME_KAKAKANE | Non-pressure chrysotile cement pipes, nominal diameter 15.75 in | LF | ||||||||||
| RIPU-RI-KANE-KAPU_KAKAKANE | Chrysotile cement coupling for non-pressure pipes BNM, nominal diameter 15.75 in | EA | ||||||||||
| DXME-KANE-KATO_KASASA | Electric winches with a pulling force of 19.62 kN (2.20 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMERI | Mobile screw compressors with electric motor, pressure up to 0.6 MPa (6 atm), capacity up to 3.5 m3/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMERI | Electricity: consumption 6.11 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||