| KAPU-ME-KARI-KATO | Concrete mixes, BSG, heavy concrete | CY | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | CY | ||||||||||
| DXME-KANE-KASA_KANEKA | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 0.46 m3, load capacity 1.10 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_KAKAME | Vibratory plates with internal combustion engine, power up to 8 HP (6 kW) | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXDXDX_DXDXKAKA | Construction waste | ton | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||