AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_RIPU | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KANE_KAKARIME | Galvanized steel roofing nails, diameter 0.079-0.118 in, length 0.787-1.575 in | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAVO-ME-KARI-RISA_KAKAVORI | T-shaped steel roofing crutch, dimensions 100x400x0.157 in, strip thickness 1.57 in | EA | ||||||||||
| KAVO-TO-KASA-KASA_KAKASATO | Galvanized sheet steel, thickness 0.7 mm | ton | ||||||||||
| MEME-ME-KATO-KANE_KAKALIRI | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.984 in, grade IV | CY | ||||||||||
| MERI-ME-KATO-MEKA_KAKAKALI | Bracket for fastening the eaves apron of the drainage system, painted | EA | ||||||||||
| MEPU-SA-KAPU-KALI_KAKAMERI | Two-component thiokol mastic for construction purposes, cold curing | lb | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEKA | Electric winches with a pulling force of up to 5.79 kN (0.59 t) | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXDXDX_DXDXKAKA | Construction waste | ton | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||