AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KASA-KASA | Welded rail tracks for continuous welded track made of R65 rails | LF | ||||||||||
| RISA-ME-KASA-KASA | Broad gauge railway rails, type P65 | LF | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKATO | Track bolts for fastening rails, diameter M27, length 6.30 in, 7.09 in, with nut diameter M27 | ton | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAME | Double-headed rail plate, type 1P65 | EA | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity 6.3-25 t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOME | Motor platforms for track layers | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOLI | Wide gauge platforms with roller conveyor | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 1200 HP (880 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAVO_KAMEME | Special trains for transporting single-tier rail strings, string length up to 2624.7 ft, number of strings up to 12 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKATO | Laying cranes for 82.0 ft rail sections on reinforced concrete sleepers | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Universal track wrenches | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Rail cutting machines | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Electricity: consumption 1.91 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Rail drilling machines, power 1.15 kW | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||