AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-KALI-RIPU | Radiographic film, sheet size 240x11.81 in | SF | ||||||||||
| KAVO-TO-KASA-KARI | Sheet steel | ton | ||||||||||
| KAVO-TO-MERI-KAPU | Rolled metal | ton | ||||||||||
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAME_KAKAKARI | Tap water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-MEDX_KAKARIME | Washing powder | lb | ||||||||||
| KAME-LI-KALI-RIPU_KAKAMEKA | Two-component developer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, development time 5-8 min, consumption 0.8 l/m2 | gal | ||||||||||
| KAME-LI-KALI-RIPU_KAKARIKA | Two-component fixer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, fixing time 5-10 min, consumption 0.8 l/m2 | gal | ||||||||||
| KAME-LI-MEME-KALI_KAKAPUME | Welding electrodes for welding low-alloy and carbon steels E55, diameter 0.157 in | ton | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x15.75 in, surface density from 105 to 0.384 oz/SF | SF | ||||||||||
| KASA-ME-KASA-MENE_KAKAKAME | Reinforced concrete anchor blocks, concrete B22.5, volume from 1 to 5.2 CY, reinforcement consumption from 50 to 6.24 lb/ft³ | CY | ||||||||||
| MEPU-RI-KANE-KATO_KASARIME | Indicator liquid | gal | ||||||||||
| MEPU-PU-KARI-KADX_KAPUKARI | Marking paint for electrical products | lb | ||||||||||
| RISA-ME-KAME-KASA_KAKARISA | Sleeper made of coniferous wood, impregnated, type II, length 59.06 in | EA | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPULI | Manual and lever winches with a pulling force of 31.39 kN (3.2 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electric winches with a pulling force of up to 49.05 kN (5.51 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electricity: consumption 0.53 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAME_KAKARI | Filling and pressure testing units, flow rate up to 392.4 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 13.23 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 16.53 ton | Machine hours | ||||||||||
| DXME-MELI-KARI_KAKAPU | Portable constant potential X-ray machines, X-ray tube voltage adjustment range 70-180 kV, anode current 1-5 mA, penetrable thickness up to 1.18 in on steel | Machine hours | ||||||||||
| DXME-MELI-KARI_MEKAME | Vacuum joint tightness testing device | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Welding machines for manual arc welding, welding current up to 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||