Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MERI-KASA | Non-woven geotextile, surface density over 0.737 oz/SF | SF | ||||||||||
| KAME-LI-MERI-KALI | Non-woven geogrids | SF | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KARI-RI-KAPU-KATO_KAKAKATO | Natural sand and gravel mixture | CY | ||||||||||
| KARI-RI-KASA-KAPU_KAKANEME | Crushed rock from dense rock formations for railway ballast, fraction from 25 to 2.36 in | CY | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to 9.81 kN (1.10 ton) | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 1200 HP (880 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_SAMELI | Two-section broad gauge mainline diesel locomotives, power 7200 HP (5300 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAVOSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KALI_KAMEME | Machines for ballasting railway tracks | Machine hours | ||||||||||
| PU_MEKAKA_KASATO | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-KALI_KARIME | Ballast graders | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KALI_SAKASA | Track machines for processing (recycling) crushed stone ballast to improve the main subgrade area during track reconstruction (modernization), capacity 300-654.0 CY/h, cutting depth up to 47.24 in, self-propelled | Machine hours | ||||||||||
| PU_MEKAKA_KALISA | Personnel: 8 persons-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAKAME | Track alignment, tamping, and finishing machines | Machine hours | ||||||||||
| PU_MEKAKA_KAVOVO | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAKANE | Track alignment, tamping, and straightening machines with a capacity of up to 2,000 sleepers/hour | Machine hours | ||||||||||
| PU_MEKAKA_KALILI | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAPUME | Dynamic track stabilizers | Machine hours | ||||||||||
| PU_MEKAKA_KALILI | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MERI_KARIME | Track jacks | Machine hours | ||||||||||
| DXME-KADX-MEPU_MEMERI | Compositions for waste collectors, capacity up to 994.0 CY | Machine hours | ||||||||||
| PU_MEKAKA_KASATO | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||