AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOKA | Average workload 3.0 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KATO-RI-KARI-KAVO_KAKAKAME | Expanding gypsum-clay cement | ton | ||||||||||
| KAPU-TO-KARI-KADX_KALIKATO | Cement-based dry waterproofing mixtures with modifying additives for eliminating active leaks in concrete and reinforced concrete structures, setting time 3 min, class B15 (M200), F25, W6, consumption 112.4 lb/ft³ | ton | ||||||||||
| KAPU-TO-KARI-MEPU_MEKAKAKA | Dry waterproofing mixtures based on activated bentonite for creating paste-like anti-filtration curtains and screens, consumption 30-10.2 lb/SF | ton | ||||||||||
| MEME-RI-METO-KANE_KAKAMERI | Flooring boards, thickness 0.984 in | SF | ||||||||||
| MEVO-ME-KADX-KANE_KAKARITO | Ball valve 11B27p1, coupling connection to the pipeline, nominal pressure 1.6 MPa, nominal diameter 0.984 in | EA | ||||||||||
| RITO-VO-KATO-KASA_KAKAKATO | Steel transition, nominal diameter 0.984 in | EA | ||||||||||
| DXME-KATO-MEME_KAKARI | Auxiliary transfer trolleys | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOPU | Auxiliary mine winches with a pulling force of 24.53 kN (2.5 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOPU | Electricity: consumption 1.06 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAPUME | Mortar pumps, capacity 1.3 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAPUME | Electricity: consumption 0.48 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Stationary mortar mixers for preparing cement-water and other mortars, capacity 350 l | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Electricity: consumption 1.32 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KADXME | Cement spreaders for joint filling | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAPU | Hammers for use with mobile compressor units | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||