AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| RISA-RI-KAME-KANE_KAKAMERI | KS-053-3 power clamp | EA | ||||||||||
| DXME-KADX-KAME_KAKATO | Railway vehicles for installation work on the contact network, tension during wire rolling up to 35 kN, technological movement speed up to 3.11 miles/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAME_KAKALI | Railcars for working on contact networks with a crane-manipulator and a wire positioning module, suspension height up to 10.5 m | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||