AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KATO_KAKARITO | Polyethylene tapes with adhesive layer, transparent, width 0.787 in, thickness 0.08 mm | lb | ||||||||||
| KAME-LI-MEME-KANE_KAKARIVO | FKDT flux | lb | ||||||||||
| KAME-LI-MESA-MEME_KAKAPUME | Galvanized steel washers, round, hole diameter M4-6 | lb | ||||||||||
| KAME-LI-MEDX-KAPU_KAKARIPU | TMKSh technical rubber plates, thickness 0.079-1.575 in | lb | ||||||||||
| KAME-LI-RIKA-KAPU_KAKAKATO | Polyester bag sewing thread made of staple lavsan (raw) | lb | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter 1.1 mm | ton | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMERI | Tin-lead solder without antimony, grade POS40 | lb | ||||||||||
| MEPU-TO-KARI-KAME_KATOLIME | VD-AK-111 water-dispersion acrylate paint | ton | ||||||||||
| MEPU-PU-KATO-KANE_KAKAKAME | ML-92 electrical insulation varnish | lb | ||||||||||
| RIKA-RI-MEKA-KATO_KAKARIKA | Copper cable lugs P 2.5-4 | 100 EA | ||||||||||
| RIPU-TO-KAME-KAME_KAKAKAPU | PVC-305 electrical insulation tube, diameter 0.236-0.394 in | lb | ||||||||||
| RISA-RI-KAME-KAME_KAKAMEPU | Plastic cable marking tags U136 | 100 EA | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||