Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Continue in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Setting up telemechanics on cable lines on the section between two power supply points with the number of powered amplifier points between them up to, 15

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/