Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Continue in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Soil excavation in channels using floating dredgers with a capacity of 32.7 CY/hour into a spoil heap, with embankment device, soil group 1 (sand)

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/