AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | ton | ||||||||||
| KAME-TO-KAME-KAME_KAKAKAME | B-70 aviation gasoline | ton | ||||||||||
| KAME-TO-KASA-MELI_KAKAKARI | Pine rosin | lb | ||||||||||
| KAME-TO-KASA-TOVO_KATOLIME | Technical stearic acid | lb | ||||||||||
| KAME-LI-KARI-KAPU_KAKAKAME | Electrical insulation cable paper, double-layer | lb | ||||||||||
| KAME-LI-KANE-MEPU_KAKATOVO | Sealing tapes made of cotton-polyester fabric impregnated with bitumen compound, width 2.95 in, thickness 0.8 mm | LF | ||||||||||
| MEKA-RI-KARI-KAVO_KAKAKAME | Round soft electrical copper wire, diameter 1.0-3.0 mm and above | ton | ||||||||||
| MEKA-TO-KARI-KATO_KAKATONE | Tin-lead antimony solders, POSSu 30-2 grade | lb | ||||||||||
| MEKA-PU-KAME-KAME_KAKAKAPU | Tin-zinc solders, zinc content 40% | lb | ||||||||||
| MEPU-ME-KASA-KAPU_KAMEKAME | Two-component epoxy-based adhesive, components A and B, brand VK-9 | lb | ||||||||||
| RIKA-ME-KARI-KANE_KAKARIME | Acid-free soldering paste | lb | ||||||||||
| RIKA-RI-KADX-MEKA_KAKAMEPU | MS-65 protective coupling for communication cables | EA | ||||||||||
| RIRI-RI-KARI-KARI_KAKAKAME | Polyethylene insulating sleeves, core diameter from 1.05 to 1.2 mm, length 2.76 in, diameter 0.276 in | 100 EA | ||||||||||
| RIRI-RI-KARI-KASA_KAKAKAME | Open rings for wires with a diameter of 4.0-5.0 mm | 1000 EA | ||||||||||
| RIPU-TO-KATO-KAME_KARIMEDX | Heat-shrinkable colored polyethylene tube, TUT 60/30 | LF | ||||||||||
| DXME-MEME-KAME_KAMERI | Installation machines for laying and installing cables based on a vehicle | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||