AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KAVO-KATO_KAKAKARI | Two-component polyurethane-based binding material | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | lb | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_RISAME | Low-pressure foam generators, capacity up to 22.0 lb/min | Machine hours | ||||||||||
| DXME-RIME-RIRI_RISAME | Electricity: consumption 0.99 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||