| KASA-ME-KAVO-MEPU | Precast reinforced concrete structures | CY | ||||||||||
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| DXME-KASA-KASA_KAMENE | Truck-mounted cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKARI | Tractor units, load on the fifth wheel coupling up to 16.53 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 16.53 ton | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MEDX-MERI_KAPURI | Multi-stage centrifugal pumps with electric drive, flow rate 78.5 CY/h, head 541.3 ft | Machine hours | ||||||||||
| PU_MEKAKA_KARIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KAPURI | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAKATO | Non-self-propelled barges, load capacity 330.69 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKAME | Tugs, power 150 HP (110 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KALI_KAKAME | Floating conductors for sinking reinforced concrete sheet piles and piles | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KALI_KAKAME | Electricity: consumption 24.2 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKARI | Non-self-propelled floating cranes, 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 person-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|