AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KASA-KAPU | Rail whip | ton | ||||||||||
| RINE-ME-KARI-KAVO | Pendulum pin | EA | ||||||||||
| ME_MEKAKA_PULI | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMESA | Shale fuel oil | ton | ||||||||||
| KAME-LI-MESA-METO_KAKAKARI | Wire cotter pins | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | lb | ||||||||||
| RISA-ME-KATO-KANE_KAKATOTO | Single-coil spring washers, type 1, hole diameter M27 | ton | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKARI | Track bolts for fastening rails, diameter M24, length 5.51 in, 6.30 in, with nut diameter M24 | ton | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAPU | Double-headed rail cap, type 1P50 | EA | ||||||||||
| RINE-ME-KARI-KAPU_KAKAKALI | Polymer spacer for rail base, dimensions 190x148x0.394 in | EA | ||||||||||
| DXME-KATO-MEME_KAKARI | Auxiliary transfer trolleys | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Rail cutting machines | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Electricity: consumption 1.91 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Rail drilling machines, power 1.15 kW | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-METO_KAMERI | Automatic electric welding machines for contact welding of suspended rails | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-METO_KAMERI | Electricity: consumption 57.43 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KARI_KATORI | Ultrasonic flaw detectors, thickness of the product being inspected up to 236.22 in | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||