AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KASA_KAKAPUME | Rubberized cotton insulating tape for electrical installation and repair work, black, width 0.787 in, thickness 0.35 mm | LF | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAME-LI-MESA-MEPU_KAMENETO | Self-tapping steel screws with a semi-circular head and a straight slot, pointed, diameter 3.5 mm, length 1.18-1.38 in | lb | ||||||||||
| MEME-ME-KATO-KANE_KAKAVOTO | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.787-0.866 in, grade III | CY | ||||||||||
| MEPU-PU-KARI-KAPU_KARIKAME | MA-22 oil paint, lithopone white | lb | ||||||||||
| MEPU-PU-KATO-KAPU_KAKAKAME | Coal tar varnish, grade A | ton | ||||||||||
| MEPU-SA-KASA-KARI_KAKAKAME | Natural drying oil | lb | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | lb | ||||||||||
| RIKA-RI-KADX-KAME_KAKATORI | Compound for filling cable joints, brand MBM | ton | ||||||||||
| RIKA-RI-MEKA-KATO_KAKAKAME | Brass cable lugs, conductor cross-section 2.5 mm2 | 100 EA | ||||||||||
| RIRI-RI-KARI-MEPU_KAKAMERI | Galvanized steel wire for overhead communication lines, ordinary, normal precision, classes 1, 2, diameter 2.0 mm | ton | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KALI_KAKARI | Railway cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 750 HP (550 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Rail drilling machines, power 1.15 kW | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||