AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RIPU-TO-KATO-METO | Modular HDPE pipe | EA | ||||||||||
| ME_MEKAKA_PURI | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KASA-RITO_KAMEVOME | Liquid sodium caustic soda | ton | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAPU-ME-KARI-KAME_KAKAKANE | Fine-grained concrete mixes (BSM), class B15 (M200) | CY | ||||||||||
| KAVO-TO-KAPU-KARI_KAKADXSA | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 0.551-1.969 in | ton | ||||||||||
| MEME-ME-KATO-KANE_KAKALIME | Edged softwood board, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.984 in, grade III | CY | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEVORI | MA-15 oil paint, colored | ton | ||||||||||
| RIPU-RI-KANE-KASA_KAKAKARI | Rubber cord pneumatic plug, nominal outer diameter up to 23.62 in | EA | ||||||||||
| DXME-KANE-KATO_KASASA | Electric winches with a pulling force of 19.62 kN (2.20 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAPU | Mobile screw compressors with internal combustion engines, pressure up to 1 MPa (10 atm), capacity up to 13.1 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAME_KAKAME | Sludge suction machines, sludge tank capacity up to 9.2 CY | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXME-RIME-MELI_KAMEME | Pneumatic breakers for trenchless replacement of pipes with a diameter of up to 9.84 in when working from mobile compressor units | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||