AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KARI-KARI | Rock cutters | EA | ||||||||||
| KAME-PU-KARI-KATO | Cutting elements | EA | ||||||||||
| KAME-PU-KATO-KAME | Bentonite powders | lb | ||||||||||
| KAME-PU-KATO-KATO | Polymers for drilling | ton | ||||||||||
| RIPU-RI-KAPU-KARI | Fiberglass pipes for microtunneling with a set of fiberglass couplings | LF | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| DXME-KATO-KASA_KASATO | Microtunneling complexes, maximum outer diameter of pipe (lining) 1.28 m, tunneling length up to 492.1 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMENE | Truck-mounted cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 16.53 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKAPU | Mobile power stations, capacity 80 HP (60 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_SAKARI | Mobile power stations, capacity 536 HP (400 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||