The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KAME-KANE | Drill bit for blasting holes | EA | ||||||||||
| KAME-LI-KADX-KAME | Ammonite No. 6 ZhV | ton | ||||||||||
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KANE-KATO_KAKARITO | Polyethylene tapes with adhesive layer, transparent, width 0.787 in, thickness 0.08 mm | lb | ||||||||||
| KAME-LI-KADX-KARI_KAKATOTO | ED-ZD electric detonators | 1000 EA | ||||||||||
| KAME-LI-KADX-KATO_KAKAKAME | APRN wire for blasting operations, VP brand | 1000 LF | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | ton | ||||||||||
| DXME-KATO-KANE_KATOSA | Electric crawler loaders for horizontal workings with a working body of "raking claws" with a capacity of 3.9 CY/min | Machine hours | ||||||||||
| DXME-KATO-KANE_KATOSA | Electricity: consumption 25.91 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KATO-MESA_KAKADX | Self-propelled pneumatic drilling rigs on pneumatic wheels with 3 drilling machines, drilling area 29.5 ft wide and 7.2 m high | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Auxiliary mine winches with a pulling force of 13.73 kN (1.4 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KATOTO | Electricity: consumption 0.46 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAME | Pneumatic jackhammers for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMERI | Drill bit sharpening machines | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|