Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-KAVO_MEKAPUKA | PMB brand paronite sheet (PON-A, PON-B), thickness from 0.4 to 0.197 in | lb | ||||||||||
| KAME-TO-KAPU-KAVO_KAKARITO | M-8DM winter diesel engine oil | ton | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIVO | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 20B-60B | ton | ||||||||||
| DXME-KASA-KAPU_KAKANE | Electric bridge cranes, lifting capacity 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKANE | Electricity: consumption 5.78 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMELI | Forklift trucks, load capacity 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||