AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KATO | Bitumen-containing mastics | ton | ||||||||||
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAME_KAKAKAME | B-70 aviation gasoline | ton | ||||||||||
| KAME-LI-KALI-MERI_KAKARIRI | Polyethylene film, thickness 0.2-0.5 mm | SF | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | CY | ||||||||||
| MERI-ME-KARI-KANE_KAKARIRI | RKP-350 roofing felt | SF | ||||||||||
| MEPU-RI-KANE-KARI_KAKAKAME | Butyl rubber | ton | ||||||||||
| MEPU-PU-KATO-KATO_KAMEKAPU | BT-783 bitumen varnish | ton | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | lb | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 1102.3 lb, lifting height 147.6 ft | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PURIME | 100 L thermos flasks | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUNE | Polyethylene film welding equipment, wedge heating power 1 HP (1 kW) | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUNE | Electricity: consumption 0.33 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||