AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MEME-KANE | Flux | lb | ||||||||||
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KAPU_KAKADXSA | SV-08HM welding wire, diameter 0.079-0.157 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOTO | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.118 in | ton | ||||||||||
| DXME-MEKA-KASA_KAKAVO | Pipe layers, nominal load capacity 22.05 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-MEKA_KAMERI | Internal hydraulic centering devices for pipes with a diameter of 27.56-31.50 in | Machine hours | ||||||||||
| DXME-MEKA-MEME_KASAME | Devices for repairing dents in pipes with a diameter of 23.62-55.12 in | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKALI | Mobile power stations, capacity 268 HP (200 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKATO | Welding rectifiers for automatic welding machines, welding current 1000 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKATO | Electricity: consumption 15.18 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RIRIRI | Field units for automatic pipe welding when working from mobile power stations, pipe diameter 23.62-31.50 in | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||